Salmon Falls Booster Pump Station

Project Details:

Contract Amount: $2,553,000

Completion: Under Construction

Owner: Private Development Group

(End User: El Dorado Irrigation District)

(916) 638-0919

Brief Description:  Constructing a new booster pump station, to include the removal of existing trees, utilizing fill material and retaining walls to build the new pad, 10” and 18” ductile iron pipe to connect to the existing pipe and stub out for future, new SD pipe and manhole, new booster pump station CMU building with a prepackaged pump skid, electrical controls, backup generator, modifications to the existing chain link fence and new site improvements for a development group for the El Dorado Irrigation District.