Skyway Well Phase 2 Construction
Project Details:
Contract Amount: $2,015,000
Completion: Under Construction
Owner: Fair Oaks Water District
10326 Fair Oaks Blvd.
Fair Oaks, CA 95628
(916) 844-3513
Brief Description: Construction of concrete well pedestal and well pad; installation of new well pump, vertical turbine pump and motor, above ground and below ground piping, valves and fittings, sodium hypochlorite feed pump, control assembly and piping, control panel, diesel powered generator with fuel tank, automatic gate control, precast architectural wall panels; and modifications to the existing booster pump station to include new exhaust louvers and air supply blower, and roof repairs for the Fair Oaks Water District.